Fixed-phase migration
Best for: a defined scope with a known target architecture and clear milestones.
Fixed price per phase, agreed before each phase starts.
You approve each phase before the next begins; scope per phase is locked.
Service
We modernize legacy systems for organizations that can't afford big-bang rewrites. Using the strangler fig pattern and event-driven migration approaches, we incrementally replace legacy components while keeping production running.
Government ministries served
Largest single contract delivered
Engineers across .NET and Java
Security and quality certifications
Your core system still runs the business, but every change feels risky and the original authors are long gone. We map it before we change anything.
An aging stack is getting expensive to keep alive, harder to staff, and slower to change. Modernization brings the cost and risk curve back down.
New requirements stall against a brittle legacy core. We open up the system incrementally so the business can move again — without a rewrite.
No big-bang rewrites. We audit the existing system, identify the highest-risk components, and build the migration path iteratively — with production staying live throughout.
We assess the existing system, its dependencies, and data, then rank components by risk and business value. The result is a clear map of what to touch first.
We design a sequenced migration path — not a big-bang rewrite — with milestones, rollback points, and a strategy to keep production live at every step.
We build new components around the legacy core and route traffic to them gradually using the strangler fig pattern and event-driven integration, with production running throughout.
Once a modernized component is proven in production, we shift the remaining traffic, retire the legacy part safely, and hand over documentation.
We never throw away a working system and hope the replacement lands. We replace it piece by piece, with each step independently verifiable.
Modernization happens around a running system. There is no scheduled outage where the business goes dark while we migrate.
We tackle the highest-risk, highest-value components first, so the biggest uncertainties are resolved early — not discovered at cutover.
Your teams keep running the business on the system during the entire migration. Nothing is paused waiting for the new stack.
Best for: a defined scope with a known target architecture and clear milestones.
Fixed price per phase, agreed before each phase starts.
You approve each phase before the next begins; scope per phase is locked.
Best for: evolving scope where priorities shift as the legacy system is uncovered.
Billed for actual time and effort, reported transparently.
You reprioritize the backlog continuously and adjust direction at any point.
Best for: large, long-running modernization that runs alongside your own teams.
Monthly rate for a dedicated, stable team.
You direct the team's roadmap and integrate it with your internal planning.

Long-lived systems under regulatory scrutiny that must modernize without service interruption.

Critical systems handling sensitive data where availability and continuity are non-negotiable.

Operational systems where downtime carries real-world risk and migrations must be incremental.

Core systems with strict audit and data-integrity requirements throughout any migration.

Student and administrative systems that grew organically and need a controlled path forward.
We close vulnerabilities inherited from the legacy stack as we migrate, hardening each modernized component instead of carrying old weaknesses forward.
Data is migrated with integrity checks, minimization, and access controls in place, so personal data stays protected throughout the transition.
Every migration step, cutover, and decommission is documented and traceable, giving you a clear audit trail of how the system changed.
No. We modernize around a running system using the strangler fig pattern, shifting traffic to new components gradually. There is no scheduled outage where the business stops.
We never replace the whole system at once. We audit it, sequence the work by risk, and replace components one at a time — each independently verified in production before the next.
It runs in phases rather than a single deadline. We start with an audit and risk map, then deliver modernized components milestone by milestone, so you see value early instead of waiting for one final cutover.
Your data is migrated with integrity checks, access controls, and GDPR safeguards in place. We validate it at every step so nothing is lost or exposed during the transition.
We help organizations design, deliver, and evolve mission-critical information systems. Let's talk about how we can help your project too.
Get in touch